📌 115年7月預定實驗排程表(更新日期 115.07.08),請點下方「展開」查看完整表格。

📌 如有期程變更或場勘需求請預先聯繫承辦窗口
▶ 展開:115年7月預定實驗排程
| 115年7月預定實驗排程(更新日期 115.07.08) |
|---|
| 項次 | 日期 | 委託編號 | 實驗計畫(工作項目) | 備註 |
|---|
| 1 | 6/25-7/3 | A26060101 | 樓板-劉o |
|
| 2 | 6/29-7/3 | A26031702 | 隔音-盛o2 |
|
| 3 | 6/30-7/8 | A26060502 | 隔音-富o2 |
|
| 4 | 7/1-7/3 | T26062501 | 玻璃-齊o |
|
| 5 | 7/1-7/13 | A26051401 | 樓板-盛o |
|
| 6 | 7/3-7/10 | A26060503 | 隔音-富o3 |
|
| 7 | 7/6-7/8 | C26061701 | TVOC-佳o |
|
| 8 | 7/6-7/10 | A25110503 | 隔音-惠o8 |
|
| 9 | 7/6-7/10 | A25110504 | 隔音-惠o9 |
|
| 10 | 7/6-7/13 | A2600046 | 吸音-建o1 |
|
| 11 | 7/6-7/17 | R26051101 | 石綿-雄o |
|
| 12 | 7/8-7/20 | A26051901 | 樓板-石o |
|
| 13 | 7/13-7/15 | C26060801 | TVOC-建o |
|
| 14 | 7/13-7/17 | A25110505 | 隔音-惠o10 |
|
| 15 | 7/13-7/17 | A25110506 | 隔音-惠o11 |
|
| 16 | 7/13-7/17 | A26060504 | 隔音-富o4 |
|
| 17 | 7/17-7/24 | A26050503 | 吸音-建o3 |
|
| 18 | 7/20-7/24 | A26060505 | 隔音-富o5 |
|
| 19 | 7/20-7/31 | R26051901 | 石綿-環o |
|
| 20 | 7/22-7/29 | A25110507 | 隔音-惠o12 |
|
| 21 | 7/22-7/29 | A25110508 | 隔音-惠o13 |
|
| 22 | 7/22-8/3 | A26052001 | 樓板-巨o |
|
| 23 | 7/27-7/31 | A26060506 | 隔音-富o6 |
|
| 24 | 7/30-8/7 | A26050504 | 隔音-建o2 |
|
| 25 | 8/3-8/10 | A26050502 | 吸音-建o2 |
|
| 26 | 8/4-8/14 | A26052002 | 樓板-巨o |
|
| 27 | 8/10-8/18 | A26020901 | 隔音-前o |
|
| 28 | 8/10-8/18 | A26061801 | 樓板-邁o |
|
| 29 | 8/11-8/19 | A26033001 | 隔音-聯o |
|
| 30 | 8/12-8/20 | A26020501 | 隔音-大o |
|
| 31 | 8/12-8/19 | A26060401 | 吸音-科o |
|
| 32 | 8/17-8/27 | A26052003 | 樓板-巨o |
|
| 33 | 8/19-8/31 | A26060301 | 樓板-淨o |
|
| 34 | 8/21-8/28 | A26061001 | 吸音-瑞o |
|
| 35 | 9/1-9/9 | A26010604 | 隔音-淀o1 |
|
| 36 | 9/1-9/8 | A26032301 | 隔音-環o1 |
|
| 37 | 9/1-9/11 | A25091201 | 樓板-源o |
|
| 38 | 9/9-9/16 | A26032302 | 隔音-環o2 |
|
| 39 | 9/10-9/18 | A26010605 | 隔音-淀o2 |
|
| 40 | 9/17-9/24 | A26032303 | 隔音-環o3 |
|
| 41 | 9/22-10/1 | A26032304 | 隔音-環o4 |
|
| 42 | 9/29-10/6 | A26032305 | 隔音-環o5 |
|
| 43 | 10/2-10/8 | A26032306 | 隔音-環o6 |
|
| 44 | 10/12-10/20 | A26033004 | 隔音-台o2 |
|
| 45 | 10/15-10/23 | A26042101 | 隔音-弘o |
|
| 46 | 11/2-11/10 | A26041601 | 隔音-利o |
|
| 47 | 11/2-11/10 | A26051203 | 隔音-台o3 |
|
| 48 | 11/11-11/19 | A26052502 | 隔音-台o4 |
|
注意事項:
- 排定試件進場時間後,請於進場日期前兩週與承辦人通知確認是否如期進場並提供安裝圖面。
- 音響類試驗場地有限,如需預先送貨請先聯繫確認棧堆空間。
- 音響類試驗進場請攜帶安全帽並遵守工安規定。
- 如有特殊用電機具請於進場前與承辦人確認是否可使用。
- 施工廠商請務必派員自行監工工班施作,以及清理施作產生之廢棄物。